Monday, March 28, 2022

SPECIAL PROCEEDING FOR CERTAIN NEIGHBOR DISPUTES


MATTER OF PANASIA ESTATE, INC. v. 29 W. 19 CONDOMINIUM, 2022 NY Slip Op 975 - NY: Appellate Div., 1st Dept. 2022:

"These appeals stem from a proceeding pursuant to Real Property Actions and Proceedings Law (RPAPL) § 881 for a license to enter adjoining property. Petitioner Panasia Estate, Inc. is the owner of the building located at 33 West 19th Street in Manhattan. Respondent 29 West 19 Condominium (29 Condominium) is an unincorporated association that operates the condominium building that abuts petitioner's building to the east and has six unit owners and a ground floor commercial space. Respondents Lauren Cipicchio and Daniel Daly are the owners of the penthouse unit in the 29 Condominium building, whose unit includes 1,730 square feet of terrace space, including a rooftop terrace abutting petitioner's building. Respondent MKF Realty is the owner of the building abutting petitioner's property to the west, which consists of five apartments and a ground floor commercial space. All three buildings are six stories tall.

Petitioner seeks to improve its property by the addition of two stories containing 15,000 square feet of commercial office space, which will take up to three years to construct. In connection with its planned improvements, petitioner sought access to respondents' adjoining properties to perform a pre-construction survey and install overhead protection , roof protection, and flashing on respondents' properties and an outrigger and netting system above portions of the properties to protect the properties.

After negotiations over a license to enter and engineering and attorneys' fees stalled, petitioner commenced this proceeding. After conducting a hearing, the court issued the order under review, which granted petitioner a license to conduct a pre-construction survey and install the overhead and roof protections, flashing, and outrigger and netting system, and to swing scaffolding. The court ordered petitioner, inter alia, to pay a monthly license fee of $3,000 to Daly and Cippichio, increasing to $4,000 after 12 months and $7,000 after 24 months, for interference with the use of their terrace; a monthly license fee of $1,000 to the nonparty first-floor unit owner of the 29 Condominium, increasing to $1,250 after 12 months and $2,000 after 24 months, for interference with the use of his terrace; and a monthly license fee of $1,200 to MKF, increasing to $1,600 after 12 months and $3,200 after 24 months, to be split among three residential tenants with roof access and the commercial tenant; to reimburse the 29 Condominium and Daly and Cipicchio $10,000 for attorneys' fees and $3,500 for engineering fees and MKF $15,278.36 for attorneys' fees and $40,500 for engineering fees; to post a bond in the amount of $1,000,000; and to provide proof that respondents have been added as additional insureds on "the relevant insurance policy."

Petitioner appeals from the order to the extent it ordered petitioner to pay monthly license fees and respondent's engineering and attorneys' fees in connection with the license and to post a bond in the amount of $1,000,000.

Respondents 29 Condominium and Daly and Cipicchio appeal from the orders to the extent the motion court declined to order a term for the license, to order petitioner to pay the professional fees they incurred in connection with the license, to refer the matter for a hearing on their attorneys' fees, to grant 29 Condominium a license fee, and to specify terms of the insurance that petitioner was required to procure.

Petitioner contends that RPAPL 881 does not authorize awards of license fees, attorneys' fees, or engineering or other design professional fees. We disagree.

RPAPL 881 provides:

"When an owner or lessee seeks to make improvements or repairs to real property so situated that such improvements or repairs cannot be made by the owner or lessee without entering the premises of an adjoining owner or his lessee, and permission so to enter has been refused, the owner or lessee seeking to make such improvements or repairs may commence a special proceeding for a license so to enter pursuant to article four of the civil practice law and rules. Such license shall be granted by the court in an appropriate case upon such terms as justice requires. The licensee shall be liable to the adjoining owner or his lessee for actual damages occurring as a result of the entry" (emphasis added).

Petitioner argues that the statutory authority to issue a license "upon such terms as justice requires" cannot be interpreted to authorize license fees, counsel fees, or other professional fees not explicitly authorized, because the statute specifically provides for liability for "actual damages" only. Petitioner contends that absence from the statute's legislative history of any mention of a monetary remedy other than actual damages is consistent with the American rule that parties to bear their own litigation expenses, since there is no fee-shifting provision in the statute.

Petitioner also maintains that public policy requires that RPAPL 881 be interpreted thus so that landowners will be encouraged to improve their properties without fear of being extorted by their neighbors.

These arguments are unavailing. What petitioner seeks is essentially to compel respondents to grant it a license on its own terms. However, as we have recognized, because "[t]he respondent to an 881 petition has not sought out the intrusion and does not derive any benefit from it. . . [e]quity requires that the owner compelled to grant access should not have to bear any costs resulting from the access" (DDG Warren LLC v Assouline Ritz 1, LLC, 138 AD3d 539, 540 [1st Dept 2016] [internal quotation marks omitted]; see Matter of Van Dorn Holdings, LLC v 152 W. 58th Owners Corp., 149 AD3d 518 [1st Dept 2017]). Thus, the grant of licenses pursuant to RPAPL 881 often warrants the award of contemporaneous license fees (DDG Warren, 138 AD3d at 540). Contrary to petitioner's contention that a license fee constitutes a windfall unless there are some actual damages, such as lost business, we have found that a license fee is warranted "where the granted license will entail substantial interference with the use and enjoyment of the neighboring property during the [license] period, thus decreasing the value of the property during that time" (DDG Warren, 138 AD3d at 540; see e.g. Matter of New York Pub. Lib. v Condominium Bd. of the Fifth Ave. Tower, 170 AD3d 544, 545 [1st Dept 2019]).

Similarly, a compulsory licensor should be entitled to reasonable attorneys' and engineering fees because:

"[a] property owner compelled to grant a license should not be put in a position of either having to incur the costs of a design professional to ensure petitioner's work will not endanger his property or having to grant access without being able to conduct a meaningful review of petitioner's plans" (Van Dorn Holdings, 149 AD3d at 519 [internal quotation marks omitted]).

Nevertheless, petitioner contends that this Court's jurisprudence granting fees as a condition of a license pursuant to RPAPL 881 has been wrongly decided because we did not undertake an analysis applying the American rule in the context of an RPAPL 881 proceeding. This argument is unavailing. The American rule deals with attorneys' fees only, not license fees or other professional fees. In any event, petitioner's reliance on the American rule is misplaced. Where the respondent in an RPAPL 881 proceeding has not refused access but rather seeks reasonable terms for access, attorneys' fees, including those incurred in opposing the petition, are not an incident of litigation but rather part of the process of negotiating a license agreement (Matter of North 7-8 Invs., LLC v Newgarden, 43 Misc 3d 623, 631 [Sup Ct, Kings County 2014]).

Unlike in other types of litigation, respondents in a special proceeding pursuant to RPAPL 881 are not accused of any wrongful conduct but are haled into court by a petitioner seeking access to their properties solely for its own benefit. That access can be extremely invasive: RPAPL 881 is designed to strike a balance between the petitioner's interest in improving its property and the harm to the adjoining property owner's enjoyment of its property.

Petitioner further contends that Supreme Court abused its discretion in granting MKF engineering fees of $40,500 as anticipated in a proposal from its engineer and that the amount was unreasonable. Because no evidentiary basis exists for granting the anticipated fees (MKF $40,500 in engineering fees and the 29 Condominium respondents $10,000 in attorneys' fees and $3,500 in engineering fees), we vacate those awards and grant MKF reimbursement for engineering fees it incurs in connection with petitioner's license, in an amount to be determined, and the 29 Condominium respondents reimbursement for engineering and attorneys' fees they incur in connection with petitioner's license, in an amount to be determined.[1]

Insofar as the purpose of a license fee is to compensate for loss of enjoyment and diminution in value due to loss of use, the license fee escalations imposed on petitioner appear to be punitive and, therefore, unwarranted.

We further modify to order that the license is granted for a period of 24 months and to direct petitioner to timely commence the project and proceed diligently, and we remand to Supreme Court to specify the applicable insurance, including policy limits, that petitioner is required to procure in favor of respondents.

Accordingly, the order of the Supreme Court, New York County (Eileen A. Rakower, J.), entered January 15, 2020, which, inter alia, granted petitioner a license pursuant to Real Property Actions and Proceedings Law § 881 to enter respondents' properties to conduct a pre-construction survey and install certain protections; ordered petitioner to post a bond in the amount of $1,000,000 and to provide proof that respondents have been added as additional insureds under the terms of the relevant insurance policy; ordered petitioner to pay monthly license fees to respondent MKF Realty Corp., the individual respondents Lauren Cipicchio and Daniel Day, and the owner of the first-floor terrace in the building located at 29 West 19th Street, New York, NY; ordered petitioner to pay MKF engineering fees of $40,500; and ordered petitioner to pay respondent 29 West 19 Condominium and the individual respondents (together, the 29 Condominium respondents) $10,000 in attorneys' fees and $3,500 in engineering fees, should be modified, on the law and the facts and in the exercise of discretion, to limit the license period to 24 months and to direct petitioner to timely commence the project and proceed diligently; to vacate the escalation of the license fees after 12 and 24 months, the grant to MKF of engineering fees of $40,500, and the grant to the 29 Condominium respondents of engineering fees of $3,500 and attorneys' fees of $10,000; to grant MKF and the 29 Condominium respondents reimbursement for engineering fees they incur in connection with petitioner's license, in amounts to be determined; to grant the 29 Condominium respondents attorneys' fees they incur in connection with petitioner's license, in an amount to be determined; and to remand to Supreme Court to specify the applicable insurance, including policy limits, that petitioner is required to procure in favor of respondents, and otherwise affirmed, without costs. The order, same court and Justice, entered September 29, 2020, insofar as it denied petitioner's motion for renewal, should be affirmed, and appeal therefrom insofar as it denied reargument dismissed, without costs, as taken from a nonappealable order.

Order, Supreme Court, New York County (Eileen A. Rakower, J.), entered January 15, 2020, which, inter alia, granted petitioner a license pursuant to Real Property Actions and Proceedings Law, affirmed, without costs. The order, same court and Justice, entered September 29, 2020, insofar as it denied petitioner's motion for renewal, affirmed and appeal therefrom insofar as it denied reargument dismissed, without costs, as taken from a nonappealable order.

All concur.

THIS CONSTITUTES THE DECISION AND ORDER OF THE SUPREME COURT, APPELLATE DIVISION, FIRST DEPARTMENT.

[1] As MKF acknowledges, Supreme Court subsequently vacated the award of engineering fees and ordered petitioner to pay engineering costs "as the services are needed, rendered and for which they are paid.""

Tuesday, August 23, 2016

WAITING FOR BUILDING PERMITS ON LONG ISLAND



If it seems like a long wait, according to Trulia, it is a long wait. In a report updated on July 19, entitled "Is Your Town Building Enough Housing?", the average months for building approval in Nassau/Suffolk is 11.4 months, and only three other communities are slower: in Arizona, California and Hawaii.

The report states:

"In sum, the rate at which we are providing housing in the U.S. relative to demand is low compared to historical standards, but this varies quite immensely across the largest 100 markets. Many places in the Southwest and Southeast actually provide a decent number of new housing units when demand rises, but others in the Pacific West and Northeast don’t. While it is tempting to blame the most popular tool of local land use regulation, zoning, we find that it is actually delays in the building permit approval process that affecting the ability of builders to meet demand. This is because zoning can formally be changed, while uncertainty over building approval cannot."

See http://www.trulia.com/blog/trends/elasticity-2016/
n sum, the rate at which we are providing housing in the U.S. relative to demand is low compared to historical standards, but this varies quite immensely across the largest 100 markets. Many places in the Southwest and Southeast actually provide a decent number of new housing units when demand rises, but others in the Pacific West and Northeast don’t. While it is tempting to blame the most popular tool of local land use regulation, zoning, we find that it is actually delays in the building permit approval process that affecting the ability of builders to meet demand. This is because zoning can formally be changed, while uncertainty over building approval cannot. - See more at: http://www.trulia.com/blog/trends/elasticity-2016/#sthash.dW1atzKR.dpuf
Is Your Town Building Enough Housing?

Thursday, September 4, 2014

AND EVEN MORE RE: SUPERSTORM SANDY

From the Town of Hempstead website:

"Hempstead Town is waiving building department permit fees (building permit and plumbing permit fees) for “in-kind” reconstruction and replacement of homes damaged by Hurricane Sandy in unincorporated areas of the town through September 30, 2014. In addition, the town will waive permit fees through September 30, 2014 for storage pods, and/or private trailers placed on property of single and two-family dwellings being repaired or replaced due to the effects of Hurricane Sandy. Residents of incorporated areas should check requirements of their local villages."

Monday, January 13, 2014

BUILDING CODES AND SUPERSTORM SANDY

NEWSDAY - Sandy caused 'substantial damage' to 3,000-plus LI homes, triggering rebuilding requirements

A footnote to the above article: a failure to follow rebuilding requirements may also affect a subsequent sale of the premises.

Tuesday, January 29, 2013

NEW YORK HOME SALE - EXPEDITORS LICENSING IN SUFFOLK

The Suffolk County law to monitor expeditors in order to better protect consumers took effect this month. According to Legislator Kate Browning: "Too many residents and business owners have to come to me over the years because they were ripped off and had no where to go. For years this had been an underground profession with no oversight, but now Suffolk County registers expeditors, and can revoke a license for impropriety. I am hoping the towns will follow Suffolk's example."

Expeditors can help homeowners pass town inspections, attain variances, get your property surveyed, or obtain new and existing permits for your home.

Tuesday, September 15, 2009

BUYING OR SELLING A HOME IN THE TOWN OF HEMPSTEAD, LONG ISLAND

It is well settled that as "long as the purchasers exert a genuine good faith effort to secure the mortgage financing and act in good faith, they are entitled to rely on the contract and may recover their down payment if the mortgage is not, in fact, approved" ( Cone v Daus , 120 AD2d 788, 790 [citation omitted]). It is also well settled that good faith performance may be satisfied as a matter of law by a buyer's mortgage application to one bank if that is all that the contract requires ( see, Ruggeri v Brenner , 186 AD2d 441, lv denied , [good faith found with one mortgage application when contract required buyer to apply to a lending institution of "plaintiff's choice"]; Macho Assets v Spring Corp ., 128 AD2d 680, lv denied , 69 NY2d 609 [good faith found with one mortgage application when contract required buyer to apply to a lending institution which was selected by purchaser]; Glassman v Gerstein , 10 AD2d 875 [good faith found with one mortgage application when contract required buyer to apply to "a lending institution"]. Thus, if your mortgage is not approved due to a lack of proper building permits, all should be well, unless of course the buyer is the cause of the lack of building permits. See MAXWELL v. DONALDSON, 0022343/2006 (6-18-2007) (Queens County.) ("In this regard, defendant cannot assert the failure of plaintiffs to perform if defendant has frustrated or prevented the performance (See, Steven Strong Development Corp. v Washington Medical Associates,303 AD2d 878; A-1 General Contracting Inc. v River Market Commodities Inc., 212 AD2d 897; Hidden Meadows Development Co. v Parmelee's Forest Products Inc., 289 AD2d 642; Young v Whitney, 111 AD2d 1013). Moreover, where the delay in the completion of a contract is caused by a party, that party will not be allowed to assert to its advantage the other party's failure to perform in a timely manner (See, Staten Island Supply Co., Inc. v Beverly-Glenwood Richmond Corp., 96 AD2d 553; Janowitz Bros. Venture v 25-30 120th Street Queens Corp., 75 AD2d 203). In the case at bar, plaintiffs have successfully raised issues of fact concerning whether, under all of the circumstances of this case, the actions of the defendant, especially in allegedly improperly altering the premises,prevented the plaintiffs from obtaining a firm mortgage commitment in a timely manner.")

YOUR MORTGAGE APPLICATION, AND/OR THE SALE OF YOUR HOME, MAY BE DELAYED OR STALLED DUE TO A LACK OF PROPER PERMITS. BE AWARE THAT IN THE TOWN OF HEMPSTEAD, EVEN ALTERATIONS AND STRUCTURES OF A MINOR CHARACTER REQUIRE A BUILDING PERMIT AND MAY BECOME AN ISSUE IN MORTGAGE FINANCING! MANY HOMES IN THE TOWN OF HEMPSTEAD, IN MY EXPERIENCE, HAVE BEEN ALTERED WITHOUT A PERMIT.
This is from the Town of Homestead's website:

"FILING INSTRUCTIONS FOR BUILDING PERMIT FOR ALTERATIONS AND STRUCTURES OF MINOR CHARACTER

1. A completed Building Permit application form.
2. Three (3) recent complete (unaltered) surveys by a licensed land surveyor, showing the plot and all existing buildings and structures.
3. One (1) photostat of a recent tax bill, showing Section, Block, and Lot.
4. Two photostats of a Plot Plan. (See Instructions).
5. If case is destined for the Board of Zoning Appeals, nine plot plans will be required with all dimensions shown (house, side, front and rear yards).
6. Plumbing Permit application or affidavit of no plumbing and electrical.
7. Two (2) sets of CONSTRUCTION DRAWINGS. (See Below).
Certificate of Worker's Compensation.
8. If the application is destined to go before the Board of Zoning Appeals, a recent record search sheet is required.
9. In the case of a Board of Zoning Appeals application, four photographs showing all four sides of the dwelling and any/all structures on site are required.

The applicant shall carefully follow all instructions on the application form and answer every applicable question thereon. Applications that are illegible or that contain erasures or scratched out words will not be accepted.

The applicant shall indicate on the "Plot Plan", the average front yard setback of the existing buildings within 200' of the subject premises on the same side of the street, and within the same block. If there are no buildings on the same side of the street, the average setback of the existing buildings on the opposite side of the street shall be indicated. Proposed additions and leftover dimensions must be drawn on the Plot plan. The Plot Plan should then be photostatted in duplicate and submitted to this office.

No person shall be permitted to alter any application except the applicant.

THE APPLICATION is a sworn statement. Anyone knowingly entering false information thereon may be guilty of a criminal offense.

Construction Drawings

The application shall be accompanied by structural drawings, prepared in a standard architectural manner to scale of not less than one quarter of an inch to one foot.

Blue or Black Line Ozalid Type Prints made from original tracings are required.

The drawings shall include a foundation plan, floor plan, cross sections, elevations, and necessary details to the following items must be submitted:

1. Completely describe the proposed work.
2. All symbols used on drawings to describe methods or materials etc. are to be standard architectural symbols.
I3. n case where the proposed work exceeds the limits described in Sec. 7302 of the Education Law of the State of New York, the Seal and Signature of a Licensed Architect or Professional Engineer will be required on the drawings.
Foundation Plans

Foundation plans shall include the following minimum information:

1. Size of footing.
2. Size and material of foundation walls.
3. Size and location of column or pier footings.
4. Size, material and spacing of columns or piers.
5. Size and material of girders.
6. Size, spacing and direction of joists above.
7. Size and spacing of anchor bolts.
8. Access to, and ventilation for, crawl spaces or cellars.
9. Thickness of concrete floor slabs.

In the case of one story frame structures where the first floor is a concrete slab on earth, and the floor slab is pored monolithically with the foundation walls, trench footings will be permitted.

In cases where a crawl space or cellar is provided, a "tee" or spread footing will be required.

In all cases, footing sizes must be proportioned to uniformly distribute the imposed loads.

In areas where unusual soil conditions are suspected, a test boring may be required to justify the proposed foundation design.

Floor Plans

Floor plans shall include the following:

1. Size and use of all rooms.
2. Size and location of all openings in exterior walls so that available light and ventilation can be determined.
3. In the case of additions to existing dwellings, indicate method for supplying light and ventilation to existing rooms that may be cut of by the proposed addition.
4. Size and swing of all doors.
5. Size and material of all headers and lintels.
6. Size, spacing and direction of joists above.
7. Indicate load bearing partitions.
8. Section cut lines.

Sections and Details

The drawings shall include the necessary cross or longitudinal sections and details to fully illustrate the proposed construction.

The sections shall indicate the following:

1. Size and material of all members shown.
2. Floor to ceiling height, depth of crawl spaces, and depth of footings below finished grade.
3. Roof pitch, expressed as a proportion of rise to run.
4. Location and type of bridging.
5. The line along which the section was taken shall be indicated on the floor plan.
Details

Unusual framing methods are to be illustrated by details drawings.

Laminated or compound structural members are to be fully detailed.

Trusses or trussed rafters shall be accompanied by a stress diagram and computations.

Fireplace chimney details shall include a plan, section, and elevation. The area of the flue must be proportioned to the hearth opening in accordance with generally accepted standards. A minimum of 8" of masonry is required between the flue and wood frame. No framing will be permitted to bear on the masonry of the chimney.

Second Story Additions

Where a second story, full double dormer or full single dormer are to be erected above an existing dwelling, the plans shall include a first floor layout and cellar plan of the existing building, in addition to the drawings of the proposed construction. The plans of the existing conditions may be prepared at 1/8"- 1'-0" scale and shall indicate the location of bearing partitions, size of girders, and the location, size and spacing of existing columns or piers. A full double dormer and a full single dormer, for the purpose of this section shall be defined as, in excess of 50% of the existing roof line.

General Notes

Notes on the drawings shall include information on the following:

1. Assumed soil bearing capacity.
2. Maximum permitted fibre stresses for all structural materials used.
3. Any information that will aid in interpretation of the drawing.
4. PLANS SHALL DEMONSTRATE COMPLIANCE WITH THE REQUIREMENTS OF THE N.Y. STATE ENERGY CONSTRUCTION CODE.

The information contained in these sheets has been complied in order to assist persons interested in filing for Building Permits.

These requirements represent the minimum standards for filing and any additional information supplied will certainly expedite the issuance of a permit.

These sheets will be revised from time to time as conditions demand.

PLEASE NOTE, that if work performed under this Building Permit produces solid waste in any form as a consequence of such work, that it shall be the responsibility of the Permitee, to dispose of such solid waste as part of the construction or reconstruction project. Department of Sanitation regulations preclude the collection of the residual of construction or construction renovation materials. Disposal facilities for such materials generated are available for this purpose, for use by the contractor or permit-holder.

It is the policy of this department to abandon and destroy, without notification, any application that has been left dormant by the owner or agent thereof for 90 days. All fees paid in relation to such an application will be non-refundable and non-transferable."